Phase 3: Factory Floor Complete
✅ Kanban Board with drag-and-drop (dnd-kit) ✅ Kanban Cards with status colors and metadata ✅ Bulk Grid with TanStack Table - Sorting, filtering, selection - Bulk operations (approve, publish, delete) - Virtual scrolling ready ✅ Article Workbench - 3-panel editor - Left: Metadata panel (status, location, SEO) - Center: Content editor (visual/code toggle) - Right: Tools (SEO, spintax, images, logs) - Auto-save functionality ✅ Titanium Pro design throughout ✅ Framer Motion animations Factory Floor production workflow complete.
This commit is contained in:
1024
frontend/package-lock.json
generated
1024
frontend/package-lock.json
generated
File diff suppressed because it is too large
Load Diff
Reference in New Issue
Block a user